Model NO.: 7497
Trademark: Huarui
Transport Package: Neutral Package
Specification: CE
Origin: Changzhou Jiangsu
HS Code: 85159000
7497 Contact Tip for Hrbn MIG Welding Torch

7497 Contact Tip for HRBN Mig Welding Torch
CO2 Contact Tip/Welding Torch tip Compatible for  Bernard  torch 
Item CO2 Contact Tip/Welding Torch tip Compatible for  Bernard  torch 
Material  Cu-E/CuCrZr
Type 7497, 0.6
7488, 0.8
7489, 0.9
7496, 1.0
7490, 1.2
7498, 1.4
7491, 1.6
7492, 2.0
7493, 2.4
Packing  50pcs/bag
Certification ISO9001, CCC, CE, ROHS, TUV

7497 Contact Tip for Hrbn MIG Welding Torch

7497 Contact Tip for Hrbn MIG Welding Torch
Changzhou Huarui Welding & Cutting Co., LTD

Since the establishment in 1985, we have become one of the biggest manufacturers of welding and
cutting equipment and accessories in China by modern manufacturing equipment and special
technology. 
We are specialized in manufacturing MIG, TIG, PLASMA, Welding Torches and Spare parts. With
Euro connector, Lincoln connector , Miller connector and Tweco connector, we can fit different kinds
of foreign equipments.
1.MIG Welding Torch
Binzel, Bernard, Tweco, Esab, Lincoln/Tregaskiss, Panasonic/OTC, MAXI, Kemppi, Fronius, Mechafin.
2.TIG Welding Torch
WP-24, WP-9,WP-17, WP-26, WP-20, WP-18, etc.
3.Plasma Cutting Torch
Trafimet, Cebora, Panasonic/Esab

7497 Contact Tip for Hrbn MIG Welding Torch
7497 Contact Tip for Hrbn MIG Welding Torch


FAQ
Q1: Can I get a samples to check the quality?
A:Sure,we can supply samples. For regular goods, the sample cost is different from the amount you
want.
For our new products, there's a MOQ of the samples.
Q2: Can I put my logo on the boxes/cartons?
A: Yes, this can be made according to your requirements, but you should send us the trademark
authorization letter.
Q3: How can you guarantee your products quality ?
A: Huarui's each torch must pass the following tests before packing: Insulation resistance test, High
voltage test, Air/Water flow test, Air/Water seal test.
If there are defective items, we usually credit to our customer or replace in the next shipment.
Q4: What's the order procedure?
A: Firstly, we discuss the details together by e-mail or TM. Then we issue you a PI for your confirmation
or Trade Assurance Order Payment Link. You will be requested to do the pre-paid full payment before
we go into the production. After we get the payment, we start to process the order. It usually takes
5-15days if we don't have the items in stock.


 

Chain

Welded Link Chains,Link Chains,Galvanized Chain

Yangzhou Jieerte Steel Cable Co., Ltd , https://www.yzwirerope.com