Jiangsu Changzhou Municipal Administrative Service Center took the lead in the development and reform commission, the Environmental Protection Bureau, the Transportation Bureau, the Maritime Affairs Bureau, the Waterway Department, the Port Department, and the Jintan-related departments. They recently carried out on-site parallel approval of the Sinochem Rubber Terminal Construction Project, and the company obtained the rapid environmental impact assessment on the spot. Solution solution. Jia Wenlian, the project leader, praised the company: "The service on the door is touching, the problem solving is fast and effective, the approval process is clear, and all the approval roads are clear, so that the project construction can be fully accelerated." The China Strategic Meridian Tire Project settled in the Jintan Economic Development Zone in June 2011 and was invested and set up by China's largest tire manufacturer, China Strategic Rubber Co., Ltd. It plans to invest 8 billion yuan in phases over five years to build a modern tire production base. The investment of 2.4 billion yuan. At present, the main body of the 78,000-square-meter rubber compounding workshop and raw material warehouse has been completed; the main structure of the main step-down station has been completed; fire inspection doors and cable trays are being installed and commissioned; and the engineering procedures for tail gas power generation, docks, and crossings are under examination and approval. After the first phase of the project is completed and completed, it is estimated that sales revenue of 4 billion to 4.2 billion yuan will be realized. Due to the large number of monomer projects in the China Cedar Project and the complexity of the examination and approval process, the examination and approval procedures involve Changzhou and Jintan. After learning that the company has encountered a bottleneck due to environmental assessments, safety assessments, etc., the Changzhou and Jintan administrative service centers quickly docked. In the form of the urban joint review and coordination meeting, the company helped the company solve the problem on the spot. Auto Parts
ZXZ Auto pares The products which
manufactured by our company such as Gear Blank ,gear sleeve,cam,2nd and 3rd
generation hub bearings, Vane Of Oil Pump, Vane Ring Of Oil Pump, Shaft Sleeve
,have been widely used in gearbox, engine, hub of automobiles, and we are
cooperative with customers from Audi ,GTMC,VW,DPCA,SAICMOTOR,FIAT, Hyundai. Forgings
are produced by 1000T+1600T electric screw press machine, using medium
frequency induction heating and full automatic operating by robot , and Japan MANYO1300T walking beam forging
equipment for high quality assurance, has lower allowance, advantages of
materials saving and better metal streamline. Use Swiss Hateubr high-speed
forging equipment AMP30S, in order to avoid the risk of water caused cracks munting
with lateral unloading system on the equipment, has advantages of lower
allowance, better parallel and concentricity, no end face burr and chamfer
defects happened.
Auto Parts,Auto Spare Parts,auto parts accessories,Automatic Parts ZHEJIANG XCC GROUP CO.,LTD. , https://www.xccbearing.com
August 24, 2021