1 Preparation before the test 1.1 Check all the bolts loose, zero, parts, instruments, auxiliary equipment is complete. This article Keywords Search: More Pumps Technical Articles Pumps Product Selling Leads Heavy Gantry CNC Cutting Machine
Optional Features:
Parameters
Type
BLDH-Z-4080
BLDH-Z-5080
BLDH-Z-60100
BLDH-Z-80100
Input power
AC380V/50Hz;AC220V/50Hz
Track gauge(mm)
4035
5000
6000
8000
Machine width(mm)
4300
5500
6500
8500
Effective cutting width(mm)
3300
4300
5300
7300
Track length(mm)
8000
8000
10000
10000
Lift(mm)
200
Cutting thickness(mm)
Flame cutting: 5~200Plasma cutting: 1~30(According to the power supply size)
Cutting speed (mm/min)
Flame cutting:100~1000
Plasma
cutting: 450~5000
Idle speed(mm/min)
0~8000
Drive mode
Bilateral drive
System
Shanghai Jiaoda or Beijing Starfire
Operating accurancy
±0.5mm
Cutting
samples
Customer
cases
Automated Plasma Cutter,Heavy Plasma Cutting Machine,Heavy Cnc Cutting Machine,Gantry Flame Plasma Cnc Cutting Machine Shandong Buluoer Intelligent Technology Co., Ltd. , https://www.buluoermachine.com
1.2 Check the lubrication of the bearing is good, the circulation of water system is smooth.
1.3 Coach should be no blocking or unevenness of the phenomenon.
The maximum diameter of the outer diameter of the coupling: 71 ~ 106, the gap between the end face: 3, the radial displacement: <0.04, axial tilt: <0.2 / 1000
Coupling the largest diameter of the outer circle: 130 ~ 190, End clearance: 4, Radial displacement: <0.05, Axial tilt: <0.2 / 1000
The maximum diameter of the coupling: 224 ~ 315, the gap between the end face: 5, the radial displacement: <0.05, the axial tilt: <0.2 / 1000
Coupling the largest diameter of the outer circle: 315 ~ 400, the end gap: 5, the radial displacement: <0.08, axial tilt: <0.2 / 1000
2 test drive two hours should meet the following requirements:
a. Smooth operation without noise;
b. Shaft seal leakage meet the requirements, ancillary piping should run, run, drip, leak;
c. Bearing temperature is not higher than 75 ℃;
d. Bearing amplitude should meet the requirements;
e. Vacuum degree of nameplate value;
f. Current stability, and not more than the rated position.
3 Acceptance inspection quality in line with the requirements of this procedure, maintenance records complete, accurate, normal test, according to the provisions of the acceptance procedures, delivery of production.
June 21, 2024